A LEADING CANADIAN CLEAN TECH COMPANY · SINCE 2015
We design and build power solutions that cut fuel use, lower costs, and keep your operations running. From construction sites to condo towers to city streets.
Choose your sector
Three pathways, one team. Pick yours and see exactly how we help.

Temporary site power that pairs your generator with battery storage, cutting diesel consumption by up to 80% and ending 24/7 runtime.
Power my site →
Electrical Planning Reports, EV charging, panel upgrades, and rebates up to $137,000 per complex. Deadline: December 31, 2026.
Get compliant →
Trenching, duct banks, conduit rodding, and private fiber installations that connect and support public and private facilities.
Build with us →What we do
Consulting, design, installation, and monitoring under one roof. Here is what that looks like in the field.

Our flagship green energy system pairs battery storage with your existing generator, so the engine stops idling and the batteries do the night shift. The PowerRack 48/14 runs two to three job site trailers plus a generator, and we build larger racks for heavy machinery.
UP TO 80% LESS DIESELAWARD FINALIST 2025Power my site →

From the mandatory EPR your strata needs by December 31, 2026 to fully installed charging stations, we handle the report, the rebates, and the wiring. One vendor, zero paperwork on your desk.
UP TO $137,000 IN REBATES48-HOUR PROPOSALSGet compliant →
Strata deadline approaching
Metro Vancouver, Fraser Valley and Greater Victoria: December 31, 2026.
Tell us about your site. We'll show you the numbers.